We are expanding our production facilities by another assembly hall with a floor space of approximately 11,000 sqft. With this, we are increasing our capacity and can make our internal work processes significantly more efficient.
Of course, the building will be designed according to the latest energy standards: Heating will be provided by a heat pump. In addition, the roof will be equipped with a 100kWp photovoltaic system, which can be expanded to an output of up to 400kWp.
The groundbreaking ceremony has recently taken place. We are looking forward to the cooperation with Felix Laumann, BSH Bentheimer Stahl- und Hallenbau, Beckonert Bau and Architekturbüro Andreas Holtfrerich!
Do you need a consultation? Call us or write to us:
+49 02573 / 93 88 – 0 | mail@laubinger-rickmann.de